أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
There's so many thing to consider how to check an error, especially in lay-outing, check data,
check temperature, miss-calculation, out of concentration of work, miss-input of data
The questions looks too simple. But the answer is not a simple thing. There are many things to be taken care of surveying. For each part, there are many solutions to take care of the errors. If you can be specific, it will be very easy to an explanation.
Sources of Errors
Two main sources:
- the equipment that you use (in good working ordre);
- the data input (coordinates, unity used, geodetic system of the geodetic network,..);
- the method of surveying used in field.
Please do mention the method of conducting land survey.Presently Total station is considered the most accurate and fastest means of land survey in small areas.In larger areas a different method is used.Again in layout Total stations share in the market is unquestionable.