أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
A. Costs of good quality – costs of bad qualityB. Planning costs – assurance costs – control costsC. Planning costs – doing costs – checking costs – acting costsD. Prevention costs – appraisal costs – failure costs
Planning / prevention
Good and bad quality
Thanks for the invite.
Option D is the most appropriate answer.
Thanks for the invite ............................d
Option D
Thanks for invitation
D. Prevention costs – appraisal costs – failure costs