أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
A. Identifying “rule of seven” patterns in control charts. B. Increasing process quality from3σ to6σ. C. Specifying the range of acceptable results. D. Identifying whether the process is in control or not.
My option is D brother. Thx for your invitation
I GESS THE ANSWER IS OPTION D AS MENTIONNED BELOW
I will go for option D ----------------------------------
the correct answer is D
regards
l'objectif de la limite du contrôle est de permettre au gestionnaire d’atteindre son objective avec l'option D
Thank you for your invitation
Option-D
D option... in my opinion is the right option
Option-D.......................,,,,,,,,,,,,,,,,,,,,,,,,,,,,.........................
D. Identifying whether the process is in control or not.
option (D) is the correct answer
My answer is for option (D)