Prior to concrete we need to clarify the below items
Reinforcement and shutter including the levels need to verify with the drawing. Make sure all the MEP services are kept in place as per drawing( if any).
Concrete mixer need to verify as per approved design, also concrete slump need to be verify,
All the equipments ( like vibrator, cube mould, thermo metre etc) and man power need be ready.
There are various methods to pour Concrete for Raft Foundation. Depending upon the Conditions, for Deep Raft Foundations in Retaining Structures, Concrete Pumps with Transit Mixers and Batching Plant tends to be the best option. As for deep Raft foundations the Fall Height of Concrete becomes Critical it is always best to deploy Concrete Pumps.