أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
In operating in a high risk environment, a company needs to make sure they avoid risks especially on people, assets, and environment, in addition to other factors chosen to be important to certain companies (reputation for example).
In order to do so, there is a need to have a standard way of performing tasks, or at least planned work steps, which are summarised in method statement for construction, or task card for maintenance jobs, along with a proper risk assessment, in which determines operational hazards, the probability of happening, and lastly, how to control. Sometimes this is evaluated by cost versus realised benefit, safety versus operation affectivity (I guess some won't agree with the last one, but the reality in corporate world that almost everything is measured in monetary terms).
I believe6 sigma will do. The area of uncertainty behond6 sigma is0.2%. This means you control99.998% of each process. Suppose you have10.000 hours of work you will only stop operations for2 hours. But this is simply math and it's completly out of touch with reality.
It's not possible to mitigate risks to this level in operations, so the approach needs the element of slack, either in the form manpower, resources, insurance coverage, etc..
One cannot predict the future but it's possible to control the income events with the right method/approach.
Risk Assessment & Method Statement are an important part of construction management procedure by which contractors continually demonstrating competence and the ability to correctly identify risks and provide appropriate controls prior to and during the course of the works.
It is not how much but how effectively is done and implemented matters
Mathod statement indicted how to work good way, any type of work. but Risk Assessment findout hazards in working area.
Risk Assessment & Method Statement are an important part of construction management because the supervisors and workers dose not known to all the hazards and its potential to the activity he carried out. The Risk Assessment & Method Statement are help them to know how the work should be carried out to avoid hazards related to works.
هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟