أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
A. Critical Path Method
B. Schedule Compression
C. Resource Leveling
D. What if Analysis
OPTION (C)..RESOURCE LEVELING. MAXIMUM RESOURCE SHOULD PROVIDE.
My answer is
C. Resource Levelling
Thank you for invitation. My opinion is option C.
The answer is resource levelling. The project manager wants to ensure that the project schedule reflects all those resource that are on a project's critical path.
Of course it is C - resource leveling & thanks for the invitation.
Schedule Compression, because activities are critical.
If resources were critical, it would be resource levelling.
I think option c because
Resource Leveling: Allocate scare resources to critical path activities first.
Thank you for the invitation. My answer is B
My answer is for the option (B)