What is the important thing you should now before conducting an inspection?

user-image
تم إضافة السؤال من قبل Abdullah Azizi Abd Latif , Field QC Inspector (Civil) , Fluor Daniel International Malaysia Sdn Bhd
تاريخ النشر: 2017/01/19
Geofrey Garcia
من قبل Geofrey Garcia , Quantity Surveyor , Sungbo Development LLC

Prior for inspection you must have the RFI, IFC drawing on that particular area to be inspected in order to check whether you meet  the standard specifications.

Vinod G Pillai
من قبل Vinod G Pillai , Mechanical and Painting QA/QC Inspector , Al Husam General Contracting Establishment

Drawings, ITP, MS and Quality procedure

jeymar aguirre
من قبل jeymar aguirre , INSTRUMENT & CONTROL SUPERVISOR , AL EZZEL O&M (ENGIE)

Must have the RFI with the specific details to be inspected against the actual / physical status of the equipment and the drawings, plans etc. 

Prior to Inspection , the following points need to be considered.

 

  • Location area and travelling Map.
  • Authorized work permit Including confined space entry.
  • Authorized travel permit if required.
  • If it is plant inside we need, H2s monitor, + gas monitor.
  • Inspection related documents like RFI, drawings, inspection tools,etc
  • Old inspection record to know the history of the job.

MOHAMEDYASIN SYED BASHA
من قبل MOHAMEDYASIN SYED BASHA , Project Quality Engineer , Alstom Transport SA

Specification / Requirements, Latest Version of Drawing, Method statement, Test Procedures Reference Document (like standards for Acceptance criteria verification) if any.

orlando jr manalac
من قبل orlando jr manalac , Civil Engineer , Saudi Electricity Company

The Construction Manager issues an IRF to QA/QC when he is satisfied the works comply with the specification and approved drawings, indicating the date and time required for inspection. The IRF shall have attached the appropriate Inspection checklist and or Quality assurance checklist fully completed by all parties.

 

Tariq Shah
من قبل Tariq Shah , Chief Mechanical Engineer (Site) , Al Fouzan Trading and General Construction Co.

you must know the work done  is as per given specificaton and approved drawing 

Edgar Zito Magbanua
من قبل Edgar Zito Magbanua , Sr. Architect , James Cubitt & Partners

You need to know and familiarized the approved plans, drawings, details, specifications and standards

rendy radianto
من قبل rendy radianto , Qc Coordinator , National Oilwell Varco

Check and identify received RFI from production against to the latest revision of IFC drawing related, familiarize with the client specification / standard to decide the acceptance criteria, prepare the inspection tools / equipment to be used.  

yiga isaac newton
من قبل yiga isaac newton , protective services officer , Lake Victoria Serena Golf Resort and Sp

target locations to inspect and u must be equipped with a pen and a note book

Mohamed Waheed
من قبل Mohamed Waheed , QA/QC painting coating inspector and senior QHSE Engineer , Sino Tharwa Drilling CO

RFI,Specification, drawing,  ITP and calibration record for inspection equipments and weather ambient.