أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
one of the best ways to control the production is the daily followup for the work in details with the responsible people by arrange meeting everyday for10 minutes to take from them breif notes on what are going and update your information daily and the other way to let ISO procedures if you have in your factory going on and control any problem coming during the work
1 - Design and created the system. تصميم النظام وإنشاؤه.
2 - information collection and management. جمع المعلومات وإدارتها.
3 - thinking critically in order to improve the work. التفكير بطريقة ناقدة من أجل تحسين العمل.
4 - reporting and the preparation of reports on the results. الإبلاغ وإعداد التقارير عن النتائج.
The system should be designed and developed to properly monitor the health of the system by creating Alarms, indication infield as well as Alarms on DCS (Distributed Control System), so that operator can know exactly about the fault and can call maintenance persons to resolve it.
Field monitoring through Light indications / buzzers as well as monitoring in DCS room (through communication of control system to DCS Room).
As far has controlling is concerned, redundant system should designed so that in case of failure of one processor/PLC (primary) the secondary processor will take the responsibility in runtime (bumpless transfer), so that there will not any production lost.
Daily Data Analysis For Production, Performance , Availability, Q.C., Breakdowns, Maintenace Downtimes, Overtime,HR, And Most Of All OEE Analysis For All Lines
1.daily check sheets monitoring(machine, product) - this means the comparison of standard values to the actual data.
2. Manpower efficiency
3. Data analysis - ex. Cp, cpk method
4. Preventive maintenance of machines.
5. Correct and appropriate measuring instruments to be use.