Which project planning tool would you use in project plan; (a)c p m, (b)p e r t (c)g e r t, (d)l o b?

user-image
تم إضافة السؤال من قبل victor ihediwa , resource person , GOshen Computer Institute, No 23 Mbaise Road, Owerri, Imo State.
تاريخ النشر: 2013/10/07
Mohamed Sulaiman
من قبل Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company

CPM is the best and i used it, CPM are commonly used tool for detailed project management planning,enabling,scheduling,costing and budgeting and other financials.Gantt charts is also commonly used for communications and progress reports.

oghenedoro eghwubare
من قبل oghenedoro eghwubare , lead project control/planning engineer , tombim services limited

cpm because it is more siutable in planning

Bhavin Mehta CCP(CCE), PMP
من قبل Bhavin Mehta CCP(CCE), PMP , Assistant Manager , Larsen and Toubro Ltd

CPM is the best tool as most of the project plannning software are based on it.

Joefil C. Jocson
من قبل Joefil C. Jocson , CEO/President , Dyas Construction and Management Consultants

this depends on the complexity of the project involve then you can use GERT which of course PERT/CPM cannot address of. all of these tools, if the user is familiar of, is very useful in planning the project in terms of determining the shortest time to complete the project, youre right - the crtical path, float etc.. let us not define each one of them, as we assumed that we already learned earlier the benefits, in and outs of these tools.

 