Robert Malak
من قبل Robert Malak , Projects Manager , Ankido Oil Services for General Contracts DMCC

 

An Incompetent Project Manager is like a child in the driver seat steering the car; it’s a recipe for disaster, he can speed up or slow down but at the end he will definitely wreck the car.

 

Just like the child, an incompetent manager lacks vision, experience, and quick decisions making ability to steer in the right direction and to get safely to the final destination.

 

However, it’s not only the child to be blame here, but the person who allowed him to sit behind the steering wheel; in this case it’s the HR to be blamed for hiring such an incompetent person.

 

Anish Ali
من قبل Anish Ali , Head Projects , LM Energy & Software Pvt Ltd

Incompetency is dangerous in all sectors whether it is planning, scheduling or resourcing. Incompetency itself is a spoiling factor whether it is manager or the team or team member being managed by manager. 

Omar Elhasan
من قبل Omar Elhasan

almost nothing good can be expected when someone who can not handle a job is assigned to do so. it is lack of responsibility on the assigners part. but i believe in chances, so if the assigned worker has room for learning and is quick at doing so and possibly has a good past according to the manager, a second chance with more direction and help might just work!

مستخدم محذوف‎
من قبل مستخدم محذوف‎

When the concept about a project is not known, when the design and scope specifications is not known

hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thank you for the invitation

Thanks for the information

 

I Agree with colleagues answer

 

Abdul Rehman
من قبل Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. A Project is made best by the team and its leader who is working on this project otherwise a project is useless if the team members are incompetent. Managing and completing a project is not a piece of cake. It requires competent people who can put in their best of efforts to successfully complete the project.

hassan shalaby
من قبل hassan shalaby , اخصائي تسويق ومبيعات، ومدرب مهارات معتمد من جامعة نوتنجهام بالمملكة المتحدة وجامعة عين شمس بالقاهرة , Galal Al , Sharif _Trading

Follower <<<<<<<<<<<<<<<<<<<<<

Ashraf E. Mahmoud (PhD)
من قبل Ashraf E. Mahmoud (PhD) , University Lecturer, Freelancer Consultant and Trainer for Int'l Business & Banking TF. , FreeLancer

Thanks for invitation,

Agree with the answer of our colleague Robert Malak

Hussein Ali
من قبل Hussein Ali , Commercial Manager , Hill-EHAF JV

Incompetent managers doesn`t have  the required skills or the minimum limit of the management knowledge to direct the firm, so his decision would be a random d and not based on a scientific basis .which means that wrong decisions will lead to a rapid  failure for the enterprise   