What kind of most common documents can be received on an construction site?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2017/03/25
Murel Fabricante
من قبل Murel Fabricante , Killa Designs , KILLA Designs

drawings, letters, specifications, report, rfi, IR, Material samples etc.

Mohamed Abdelraouf Moussa Ghazy
من قبل Mohamed Abdelraouf Moussa Ghazy , Senior Document Control , Arabian Rafters

Letters, Submittals, Work permission, Request for inspection (RFI) & Reports

ASIF HAFEEZ
من قبل ASIF HAFEEZ , DOCUMENT CONTROLLER , PRESSON DESCON INTL PVT LTD.

There is lot of documents are involve in an project construction site, but mostly two type of documents (Quality and Engg. deliverables) are used.

Quality documents are consist of (QIP's, Method Statements, Request for Inspection & Testing, Tech. Query Sheets, Quality Alerts, CAR & PAR, WPS, MTC's, NCR's, Test Packs, Punch Lists etc.).

Engg. Deliverables consist of (Foundation & Detail Drawings, Plan, Elevation & Section Dwg., P&ID's, GA Drawings, Piping Isometric Drawings, Red Markups etc.).

 

And also Transmittals.

REHAN AHMED
من قبل REHAN AHMED , QA/QC CIVIL ENGINEER , ARRIYADH NEW MOBILITY (ANM)

1.contract paper 

2.approved shop drawing

3.approved method statement

4.Approved inspection test plan

5.Material approval list

6.Quality management system

7.Quality policy

8.Quality control plan

9.Health and safety plan

Mohamed navas P K
من قبل Mohamed navas P K , Document Controller , Qatar Building Engineering Company

Drawings,RFIT,Material subamittal Approvals,Reports, approval,and General Transmittal,NCR's,CAR,Method Statement.

Fawaz Alnassar
من قبل Fawaz Alnassar , Project manager/ program manager , Alrajhi Bank

The construction contract.

Akash Patras
من قبل Akash Patras , Officer Document Control , Emarat Europe Fast Building Technology Systems Factory L.L.C

Letters, Tranmittals, Non Conformance Report, Site Instructions, Request for Information, Confirmation of Verbal Instruction, Invoices, Interim Bills, Variations, Tender Drawings, Authority Approved Drawings, Issued for Construction Drawings, NOCs, Permits, Material Submittals, Pre-qualification Submittals, Method Statements, Shop Drawings, Technical Submittals, Document Submittals, Work Inspection Requests, Material Inspection Requests, Daily Progress Report, Weekly Progress Report, Monthly Progress Report, Baseline Program, Minutes of Meeting, Operation & Maintenance Manual, Warranty/Guarantee Certificate, As Built Drawings

Zahid Riaz
من قبل Zahid Riaz , Senior Document Controller , Dar-al-Riyadh Consultant

Drawings 

letters

reports

RFI

MIR

Material sample

FCR

ETC

مستخدم محذوف‎
من قبل مستخدم محذوف‎

The most common documents can be received on an construction site are drawings.

Jalandoni Minimo
من قبل Jalandoni Minimo , Lead document controller , AECOM Arabia

Letters, RFI, Technical Queries/Interim Payments/Variation are the most common. But in the part of 80% of the project, submission such Field Change Report which need to be commented by Consultant as well, As Built Drawings.

Gregory Morta II
من قبل Gregory Morta II , Document Control / Admin Support , Railway Project Management Company

Letters. Material Submittals, Request For Inspections, Shop Drawings, As Built Drawings, Bill of Quantities, Interim Payment Certificates