ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

When should you use the Perform Integrated Change Control process?

user-image
تم إضافة السؤال من قبل Wael Moustafa Elagamy , Project Manager , Saudi Building Technic
تاريخ النشر: 2017/03/26
ausaf ali
من قبل ausaf ali , Maximo Consultant , Ora-tech systems

when two different modules do not pass info, then integrated change is needed.for example Payroll module deducts car loan amount from employee and does not generate GL voucher entry reducing employee car balance in Accounts module.

Muhammad Ahsan Zia
من قبل Muhammad Ahsan Zia , Assistant Production Manager , Al Karam paper Mills Pvt Ltd.

Perform Integrated Change Control. Reviewing all change requests; approvingchanges and managing changes to deliverables, organizational process assets, project documents, and project management plan; and communicating their disposition. Change Control.

المزيد من الأسئلة المماثلة