What is meant by Scope Creep & explain details about Compression & Fast Tracking ?

user-image
تم إضافة السؤال من قبل Jacob P , IT Project Management Consultant , Eickhoff Wind Asia Pvt Ltd
تاريخ النشر: 2017/04/09
Mudassar Syed
من قبل Mudassar Syed , Sr. Lead Engineer , TATA AUTOCOMP SYSTEMS LTD TECHNICAL CENTER

When scope of product or project, gets additional changes without adjustments to time, cost and resources assigned to original scope baseline, it is called scope creep. Change is inevitable, but a change control process should be there to keep in on track.Schedule compression shortens the project schedule without changing the project scope, to meet schedule constraints or or other schedule objectives.Fast tracking is one of techniques of schedule compression in which critical path activities are carried out in parallel that were originally planned in series.Fast tracking often results in rework, usually increases risk and requires more attention to communication.

muthalif m
من قبل muthalif m , Site Engineer , Acorn Builders

deformation of structure under sustained load. Basically, long term pressure or stress on concrete can make it change shape. This deformation usually occurs in the direction 

Javad Taghavi
من قبل Javad Taghavi , Program Manager, Senior Adviser in Project Management , KCE Co.

scope creep is deviation from project scopes which documented in scope baseline.

compression is a technique for shortening project duration.

fast trucking is a procedure of schedule compression with using of activities overlapping 