risk that still exist in the activities after all control/ mitigations had been defined

Nuha Awad Osman Osman
من قبل Nuha Awad Osman Osman , Program Quality Coordinator , World Vision

Residual risk is the risk that remains after a risk control measures are taken into considerations and applied. At this point, Residual risk will be calculated as follows:

Residual Risk=Cost*Threat*Vulnerability