ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

You are a project manager, the consensus (team, stakeholder) decide for a solution for an issue in which you do not agree of, what will you do?

user-image
تم إضافة السؤال من قبل Joefil C. Jocson , CEO/President , Dyas Construction and Management Consultants
تاريخ النشر: 2013/10/09
aditia doni
من قبل aditia doni , SAP PM , UAE Landforces

which phase in project management , consesus decide solution for an issue ?

as the project manager have responsibilities the control  Scope project, Cost project , hr project, project risk, quality project ,project time .

 

let assume consesus decide solution in the midle period of  project  running.

as long as the come up  solution (team and stakeholder) still meet  it , you can go ahead with that solution .

but if the solution will affect  one of these: Scope project, Cost project , hr project, project risk, quality project ,project time, project procurement . You should make perform integrated change control (output change reques status, project mgt plan update, project doc updates)

 

Mohamed Mohamed Samir Aly El deghady
من قبل Mohamed Mohamed Samir Aly El deghady , Electrical maintenance supervisor engineer , Nissan motor egypt

I think need QC story if it's technical problem ,plus benchmarking.

if conclusion is50/50, voting.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

I'll ask for a clarification about the solution they want to implement. Specifically, I want a clear path of action to solve the issue and if these course of action is very clear on the solution they advocate then why should I disagree. Though their course of action maybe be different from what I want, I could also be possible to inject some of my own to theirs.

 

The important thing is that we come up with a possible solution, it doesnt matter if it came from me or it is the idea of another, as long as it provides a good chance to solve an issue, then so be it.

المزيد من الأسئلة المماثلة