Thank you for the invitation
Agreed with colleagues
Thanks for the invite. Sorry, the question is out of my field.
FLOORING WORKER M2/10 INTERNAL PLASTER M2/12 EXTERNAL PLASTER M2/25 CERAMIC WALLS M2/7 PAINTER WORKER M2/25 CARPENTER M3/1 STEEL FIXER M3/1 MASON M2/10
Productivity is a measurement of input with the desirable output for any work task. So its depends on what you standardize in activity list and WBS during the project planning.
Actual productive efficiency:
They are shown by the daily results of the operation and actual performance of all the elements produced in the factory by continuous measurement of this performance and the time and cost it takes.
thanks for the invite i agree with mr Aneesh answer