ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How to solve the contradictions of the main factors (cost, scope, time) through a project management?

user-image
تم إضافة السؤال من قبل Ahmed El_Serafi , IT Project Director , EchoLink Co
تاريخ النشر: 2017/06/20
mamoona alam
من قبل mamoona alam

First of all see the flexibility of the project then plan with low cost within proper time farm after proper planning Implement it

mohsin Shaikh
من قبل mohsin Shaikh , Assistant manager , Red tag

You have be prepared before and check the qoatation

Abdullah Al Saedan
من قبل Abdullah Al Saedan , Safety Engineer , Saudi Electricity Company

It's a factors you and your customer have agreement on. So you can't extend or exceed one on other. At worse case if this happened you should make a meeting with the customer to discuss with him the new situation and this will cost more money and time because you need to reschedule life span for the project due to any changes on one of them.

مستخدم محذوف‎
من قبل مستخدم محذوف‎

By balancing the project factors, balance between each factors,Scope refers the quantity and quality of what needs to be delivered in the project. Cost refers the financial cost of the project and time refers to the amount of time in which the complete project must be delivered.

Muhammad Khan
من قبل Muhammad Khan , System Engineer , Pak Turk Maarif International school and college

These are the main factors of project and language which is you are using with your body language.

Sikender Bhandari
من قبل Sikender Bhandari , Store inchager , Calantha Retial pvt

Hi, Iam sikeder bhandari we hav to save ,cost and time

Hassan hashem
من قبل Hassan hashem , IT Teacher , Al Yusr onternational school

Use cost, scope and time. Any one of these drop down is a failer.

Paul Coates
من قبل Paul Coates , QHSE Manager , Khansaheb

Good estimation at the tendering stage. Careful planning and adequate resource and time built into the Project. Visible felt leadership and management to maintain steady progress and ensure continuity when there is slippage or unforseen setbacks. Flexibility and a good supply chain. Slick procurement and efficient work processes. Happy, healthy and safe workforce. Supervision.

The main factors for me will be the absent or failed defences,Equipment and tools,Team and individual factors,environmental factors and organisational factors.All of these factors does have information related to the title for e.g with absent or failed defences,one would ask the question as to at the time of the incident what was absent that caused the scaffold to collapse or what failed to allow the scaffold to colapse.

Dhananjay Damle
من قبل Dhananjay Damle , Splashland Nigeria Ltd

To me, commercial department plays a vital role in successful completion of any project. The success of the project management rests in three steps listed below:

Step I: Preparation of flowchart of the entire project from award stage till completion level should be ready before actual award of the project.

Step II: Preparation of Funds Flow Statement based on Flowchart and get it circulated to all concerned department heads. Periodical review is the interim stage as it is a continuous process.

Step III: Amendment in Flowchart, Funds Flow projected and actual stage of the project and recirculation to all departmental heads and review on weak links are the three steps to solve the contradiction of the main factors through the project management.