ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How much is proper / improper WBS and Job-phase definition on a project success/failure important ?

user-image
تم إضافة السؤال من قبل bahram haghighi , Project Manager , SSK - construction contractor
تاريخ النشر: 2017/07/01
Arvind Arya
من قبل Arvind Arya , Additional Chief Engineer , Ajmer Development Authority

It depends on may factors like:

1. Type of project

2. Budget availability

3. Time availability

4. Project importance

5. Project duration and

6. Project complexity and many more such factors.

Apart from above in perfect situation, WBS should be drilled down to an extent where each task can be executed independently. It plays an important role in the success/failure of the project. Detailed and properly prepared WBS will help in good achieving results.

المزيد من الأسئلة المماثلة