أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
First, all required chemical and physical tests (size, hardness, resistance and fines content) must be carried out to the aggregates (gravel and sand), in order to verfy the optimal mix of aggregates. thereafter, the optimal percentage of betumin must be determined by testing different mixing percentages by two ways (either hot or warm).
Ingredients:
- Aggregates;
- betumin;
- Meniral filler;
- and Additives (optional).
Main Ingredients of Asphalt Mix:Aggregates wiich includes Gravel, Sand and Aggregates-95% and Bitumen 5%
First we mix gravel with a hot bituman
There areany different way to prepare asphalt. Generally there is running two kind of asphalt mixes first is hot mix and the temperature of hot mix about 140 celcius to 160 and other is warm mix and the temperature about 90 celcius to 120 :)
VERIFYING THE MIX BY TESTING
THERE ARE TWO DESIGNING METHODS :
1- MARSHAL METHOD.
2- SUPERPAVE METHOD.
THE MAIN IGREDIENTS :
- AGGREGATES (COARSE AND FINE).
- MINERAL FILLER.
- BITUMEN (MODIFIED OR PURE).
- ADDITIVES (OPTIONAL)
MIX DESIGNING IN BREIF :
- AGGREGATES PASSED-BY THE PATCH-PANT DRYER (HOT BIN).
- CHEMICAL AND PHYSICAL TESTS FOR THE AGGREGATES (RESISTANCE,SIZE,HARDNESS AND DENISTIES).
- BLENDING DIFFRENT SIZES OF AGGREGATES TOGETHER.
- TRY DIFFRENT %S OF BITUMEN WITH THE SELECTED BLEND.
- SELECT THE OPTIMAL BITUMEN %.
- VERIFYING THE MIX BY TESTING.
Main Ingredients:-
- Coarse Aggregates
- Fine Aggregates
- Filler
- Bitumin
- Polymer if necessary according to the design
Preparation of Marshal Bituminous Mix Design:-
* First of all we need aggregate gradation for coarse and fine aggregates
* Making its blending according to the specifications
* Checking Bitumin specifc gravity, aggregates specific gravities
* Then according to the blending making proper Combined specific gravity that will be used as a refference for further tests of asphalts on regular basis.
* Then Take a blending and mix the bitumin in mixing bowl or on a hot plate maintaing the temprature required
* Make a sample for maximum theoretical specific gravity
* Make the marshal mold accordingly
* Check its density, flow, stability and loss
* The fill up the marshal form and check all the properties
* Repeat this process at least five time to check the maximum asphalt content percentage
If need Super Pave, then tell please also
Bitumen ingredients is most important while prepare asphalt mix and other ingredients also important.