What is the major aspect you will look at before preparing method statement for Steel Reinforcement?

user-image
تم إضافة السؤال من قبل Jawad Ali , QA/QC Inspector Civil Architecture , Salini Saudi Arabia
تاريخ النشر: 2017/07/27
Venkatesa Perumal Balu
من قبل Venkatesa Perumal Balu , Construction Manager , Cairn India Ltd

Whether we have the latest revised drawings for ensuring the type of reinforcements to be used in the particular project site as per soil investigation reports

 

Tharabai Jayaprakaash
من قبل Tharabai Jayaprakaash , Computer Science Teacher , Mount Christian Higher Secondary School

preparation of the substrate prior to repair will often determine whether a repair project is ,

  • critical aspects of durability of concrete repairs and
  • overlays is a lasting and,
  • Common surface

preparation methods include

  • mechanical roughening and
  • blast  thawing or thermal movements
  • and corrosion of steel reinforcement.

المزيد من الأسئلة المماثلة