ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

If a critical activity is blocked due to an unavoidable situation, how to overcome and complete the project on time?

user-image
تم إضافة السؤال من قبل Thomas Kollannur , Chief Executive Officer , Apt Engineering consultants
تاريخ النشر: 2017/08/01
Rajiv Prabhu
من قبل Rajiv Prabhu , Marketing Strategist , Creatix Digibar

Have a look at the client brieffs and start sourcing from the current state,fresh. move to the closest substitutes

Thomas Kollannur
من قبل Thomas Kollannur , Chief Executive Officer , Apt Engineering consultants

Change the Critical path and cut short the time and use the flexibility to sort out the blocked activity.

المزيد من الأسئلة المماثلة