ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

At what level is BIM (building information modeling) being currently implemented by employers in Saudi Arabia?

user-image
تم إضافة السؤال من قبل Raheel Mohammed , Building Services Engineer , Link365 Ltd
تاريخ النشر: 2017/10/01
Jamiel Panumpang
من قبل Jamiel Panumpang , BIM Manager , Modern Business Innovator Co LTD

BIM Level in Saudi Arabia is very complicated to identify because of absence of common standards in which all company should comply. Second reason is that not all company impliments BIM. Specially nowadays where AEC industry is  in crisis. Third reason is that each company in Saudi BIM is following their own standard. So if we consider UK Standards (BS 1192), most companies in Saudi is in Level 2. In Level 2, there is collaboration among BIM participants however, model (mostly a duplicate model) is being shared in all participants.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟