The Japanese resource management model exhibits?

 A. a Theory Z style of management B. frequent changes in team assignments C. a cooperative spirit of goal setting. D. All of the other alternatives apply. E. non-specialized career paths

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2017/11/09
Ganeshkumaar Sinnasamy
من قبل Ganeshkumaar Sinnasamy , Owner , GMRR BROTHERS

  • Ensure resource availability and resolve resource conflicts.
  • Optimise time, effort and cost.
  • Ensure workers with the right skills are available.
  • Identify limitations, such as site access, weather conditions, and so on.
  • Reassign resources in response to circumstances.
  • Track resources utilisation to avoid excessive resourcing or under-utilisation.

It should list key information about the required resources for each activity:

  • Type of activity.
  • Start date and duration of the activity.
  • Activity owner.
  • Resource type and quantity required.
  • Source/supplier of each resource type.
  • Equipment required.