أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
Understanding the equipments , the installations , detect the middle degree of their corrective maintenance , and respect the plannings of maintenance , and contact the equipment and tools suppliers
Preparation is best .how to work
First things to do is to understand the manual, every equipment should have a define PM Job plan from the OEM. Since the case may vary depending on the situation like the equipment environment and other factors, the best thing to do is to conduct a study on every activity. This may define if we may adjust the PM frequency, also one important activity is to determine the failing parts and use statistics which item is consumed frequently. That would trigger an engineering mind on the things we need to work on to avoid such cases.