ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How you can minimise your transit cost and decrease latency?

user-image
تم إضافة السؤال من قبل Mirza Ahmer Baig , Network Engineer , DE-CIX Management GmbH & UAE-IX Dubai
تاريخ النشر: 2017/11/26
Ain ul Hayat Soomro
من قبل Ain ul Hayat Soomro , Sr. Structural Design Engineer , Al Jazirah Engineers & Consultants

We can minimize it by applying the Project Crashing Method where Crashing is a schedule compression technique used to reduce or shorten the project schedule.

The PM can various measures to accomplish this goal. Some of the common methods used are,

1-Adding additional resources to the critical path tasks:This option has various constraints such as the securing of the budget to add the resources, and the availability of the resources.

2-Reduce the project requirements or scope:This can be done only if the sponsor and major stakeholders agree to reduce the scope

After applying the crashing, the critical path might have changed and result in creating a different critical path. Always revisit the project schedule to ensure the schedule has been crashed.

المزيد من الأسئلة المماثلة