How long a project of 50 floors, usually take to be delivered to the client?

a -10 months b -12 -14 months c - More than16 months

user-image
تم إضافة السؤال من قبل Franck Improta
تاريخ النشر: 2013/10/20
Zafar Iqbal
من قبل Zafar Iqbal , Teacher (Pak Studies) Subject Specialist , Home Tutor

More than16 months

Abdulwahab Madhat Agha
من قبل Abdulwahab Madhat Agha , General Manager Operations , Royal Hospitality Org

C-More than16 months

Wayne Greiner (MBIFM)
من قبل Wayne Greiner (MBIFM) , Engineering/ Facilities Manager. , Hertfordshire Constabulary

Depends on many things but mainly on the availability of resources and a clear and defined scope of works.

 

Wolf Klaas Kinsbergen
من قبل Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

Depends on a lot of things, but for  a medium sized building (footprint600 to8000 meters): foundation ( no parking layers)2 months, try to design a construction type for1 floor per week, so that sets a goal for the team every week.

Mohamed Sulaiman
من قبل Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company

I think for50 floors building it takes more than16 months

مستخدم محذوف‎
من قبل مستخدم محذوف‎

The timing for delivery will be governed by the following; 

Why?  

Where?

By who and how much ?  

javid Qadri
من قبل javid Qadri , Deputy Project Manager , HKH

one floor per week-two years total subject to the competency of  construction manager and general forman