ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Is material selection process affects schedule of project? how?

user-image
تم إضافة السؤال من قبل Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company
تاريخ النشر: 2013/10/20
FOWZY seraj
من قبل FOWZY seraj , project manager , APSG in King Abdul-Aziz Airport (Hajj Terminal )

Material selection is a step in the process of designing any physical object. In the context of product design, the main goal of material selection is to minimize cost while meeting product performance goals.[1] Systematic selection of the best material for a given application begins with properties and costs of candidate materials. For example, a thermal blanket must have poor thermal conductivity in order to minimize heat transfer for a given temperature difference.

Systematic selection for applications requiring multiple criteria is more complex. For example, a rod which should be stiff and light requires a material with high Young's modulus and low density. If the rod will be pulled in tension, the specific modulus

Yousef Al Kussas
من قبل Yousef Al Kussas , SR MEP MANAGER , EL- SEIF ENGINEERING CONTRACTING COMPANY

Yes  , Less process   will  progress the  materials availabilty  mainly the process of company  or Consultan / Client Approval process .