ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

As you determine the requirements, constraints and assumptions for the project you record them in which document?

A. Communications Management Plan B. Project Management Plan C. Project Scope Statement D. Project Charter

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2018/06/27
ibrahim ahmad
من قبل ibrahim ahmad , Acting MEP Manager , Al Saad General Contracting Co

C. Project Scope Statement 

Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

Answer: CExplanation: The Project Scope Statement is where you figure out exactly what your stakeholders need, and turn those needs into exactly what work the team will do to give them a great product. Any constraints or assumptions that need to be made to determine the work need to be written down in the scope statement as well.

mohamed abdelrhman abdelgadir saeed
من قبل mohamed abdelrhman abdelgadir saeed , Software Engineer , National Information Center

Key deliverable of project and high level of requirements ,assumptions and constraints using tools like project scope statement to describe and documented , project scope statement is useful tools when new change request is made

Khaldoon Albeik - PMP - PSM
من قبل Khaldoon Albeik - PMP - PSM , IT Business Solutions Manager , Japan Tobacco International (JTI)

It depends on the PMO standards in your organaization, in some cases the are recorded in the Business Case

Amal Rohitha
من قبل Amal Rohitha , Officer

Laundry in charge 9 years experience in U. A .E worked with two company at Hotel industry and Hospitalaty service

Fadlallah mohamed
من قبل Fadlallah mohamed , Sector manager , SDDRC /Sudan

It can be recorded in external device or hard disk drive with secured lock.

المزيد من الأسئلة المماثلة