أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
This is the first stage of a construction project, and once it is completed, it signals the beginning of the bidding process. In design-bid-build contracts, the owner chooses a contractor based on completed designs.
In this stage, an architect or engineer first assesses the feasibility of the design based on regulations and codes of the building, as well as the number of rooms, the size of the building, and the amount of space. Then he or she creates schematic designs or sketches, researching the type of equipment and materials needed and their cost.
the main key of architectural project management is coordination.