أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
scope and cost performance, such as which budgets have been met and which are not. B. It should be integrated into the integrated change control system C. Integrated change control system D. It defines the approval level necessary for authorizing the changes E. It defines the procedures by which the cost baseline may be changes
A. It provides information on the project scope and cost performance, such as which budgets have been met and which are not.