ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the initial setting timing of concrete?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2019/07/18
Rajesh Gulabani
من قبل Rajesh Gulabani , Senior Cost Manager , Neyo India Ltd

Initial setting time of Concrete depends on the type of Cement used, like for Ordinary Portland Cement (OPC) Initial setting time, is 30 Minutes. Whereas, for concrete setting time depends upon the Admixtures added in Concrete. Usually, it's preferred that concrete should be laid within 3 Hours of it's dispatch from Concrete mixer or Concrete plant, because the hydraulic (Chemical) reaction between CaO (Calcium oxide) and H2O (Water) starts. Thus, any sort of delay will affect workability and Compressive strength. 

المزيد من الأسئلة المماثلة