ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How do we measure graph in lean sigma?

And also kaizen-changes for better. Lean - elimination of wast. What is the difference between in these. Where elimination of wast will changes for better.

user-image
تم إضافة السؤال من قبل mohammed manzoorulla , Customer Representative officer , MOBILY INFOTECH
تاريخ النشر: 2013/12/08
Piotr Teteruk
من قبل Piotr Teteruk , IT Project Manager Roche , Roche

Process improvements and requires use of DMAIC.

First determine the following:

1  Who will collect the data?

2  Who will analyze it?

3  Who wants to see the results of the analysis?

4. Who needs to see the results of the analysis?

 

Then :

1.    Determine All the Key Players

2.    Meet with All Key Players

3.    Prepare a RACI Diagram

4.    Analyze the RACI Diagram

5.    Ensure Agreement and Distribute the Diagram 

 

When completed, the Black Belt must ensure agreement among the key players. If all are in agreement, distribute the RACI diagram. The RACI diagram can be completed at a macro-level (like the one in this example). It also can be used at a micro- or low-level detail to shows individual components of each listed phase.

المزيد من الأسئلة المماثلة