أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.
The baseline is the original range, total cost and schedule of a project.
It is used to measure the amount of deviation of performance from the original plan. Before, the execution of the project, the baseline must be properly defined and documented.