ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the toughest part about Electrical testing?

user-image
تم إضافة السؤال من قبل Ali Sayyed , Accountant , Cairo Bank
تاريخ النشر: 2013/06/10
Ronaldo Gonzaga
من قبل Ronaldo Gonzaga , 2nd watch keeping engineer , National Marine Dredging Company

The toughest part of electrical testing is when everything are installed and connected then the system doesn't meet the condition of the working operation.
That is where your expertise will emerged adjusting to the condition that will meet the requirements sometimes beyond the limit of performance but with in safe aspect.
Electrical testing sometimes will put your analytical techniques to answer why it doesn't work when you follow everything base on the plan.

Yassein Abd Elhafeiz Alkady
من قبل Yassein Abd Elhafeiz Alkady , Maintenance Manager-A&I Engineer , Saudi Tumpane (Abu Nayyan Group )

The toughest part of electrical testing is the ((Time)) ...
when you trying hard to challnge the time to find the problem >> the professional testing engineer who find the problem as fast as possible without affecting the system continuity

المزيد من الأسئلة المماثلة