How will you find critical paths for network diagram having relationships other than Finish to start?

user-image
تم إضافة السؤال من قبل mohamed saffin , Planning Engineer , Alfanar Construction Company
تاريخ النشر: 2014/03/06
USAMA YOSSRY AHMED GENDIA
من قبل USAMA YOSSRY AHMED GENDIA , Resident Engineer , ACE ARAB CONSULANT ENGINEER - MOHARM BAKHOOM

START TO START WITH SAME DURATION

FINSH TO FINSH

ALL LEED TO critical paths

Ahmed Montasser Hasan Ibraheem Farag
من قبل Ahmed Montasser Hasan Ibraheem Farag , Project Manager , Rawafed Tech

it is very easy from msproject only push a button to find the crtical path

Muhammad Ali Khan
من قبل Muhammad Ali Khan , Proposals Engineer , Enerflex Middle east

The Longest Duration Path will give you the information for the critical Path. Draw the network diagram and calculate the longest path. The longest Path with max duration will give you the critical path.

Mohammad Tohamy Hussein Hussein
من قبل Mohammad Tohamy Hussein Hussein , Chief Executive Officer & ERP Architect , Egyptian Software Group

Perform forward pass analysis and backword pass analysis to identify the tasks with0 float. The critical path is composed of the consequtive tasks with0 float.

Mahmoud Abdulkader    Darwish
من قبل Mahmoud Abdulkader Darwish , Project manger , AL-AYUNI Investment & Contracting Co.

  1. FINISH TO START
  2. FINISH TO FINSH 
  3. START TO FINISH 
  4. START TO START 

 