ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What Should be the location of construction joint in Slab,if needed?

user-image
تم إضافة السؤال من قبل Shahalam Afridi , Procurement & Contract Specialist , SMEC International Pvt Ltd-
تاريخ النشر: 2014/03/16
RENESA ALAM
من قبل RENESA ALAM

It should be provided at the point of zero or minimum stresses.

Saghir Saghir Ahmad Butt
من قبل Saghir Saghir Ahmad Butt , Chief Executive Officer , 3M Associates Engineers, Builders & Interiors

it's recommended that it be in the middle third of the span.

Shahalam Afridi
من قبل Shahalam Afridi , Procurement & Contract Specialist , SMEC International Pvt Ltd-

where there are zero shear stresses.

Naveen Nishchal Pandey
من قبل Naveen Nishchal Pandey , Site Engineer - Civil , Glair Infrastructure Limited

Location of Construction joints should be -

 

  1. Construction joint shall be provided preferably at a location where stress are zero.
  2. Construction joint is provided at one-third or end of support.
  3. Also provide key and rebar to transfer shear stress if shear stress is not zero at point of construction joint.
  4. Provide construction joints as minimum as possible.
  5. Construction joint shall not be left on discretion of contractor. It must be approved by designer.

المزيد من الأسئلة المماثلة