To secure my team during the feild work
Engr H. Qutb
waiting the mechanical department to finish the material approvals
working under pressure . and without safety.
Reducing cost and eliminating impact to environment are the very difficult part of electrical systems.
When you are really good at electrical systems, then for sure nothing is difficult..
I think the patience to faults dipsticks
i want to learn PLC.
Every science is dificult if we are not mastering it. The key is kowledge. So no word late to learn and learn and practice. The experience is the best teacher. Good luck for your sir.
Depending on the type pf work & projects and whether you are a consultant or contractor,
A- If you are a contractor:
B- Waiting to get all real demission, electrical load for all Mechanical, Plumping & Electrical Equipment material to start design final shop drawing.
C- Waiting to get final approval from the consultant & local authorities
D- Testing & commissioning (Hoping while starting that (No Errors or no missing cable , conducting block , wiring not pulled inside )
B- If you are a Consulting :
1- Waiting to receive all , electrical shop drawing for all Mechanical, Plumping & Electrical Equipment material from the contracting to provide reject/approve with comments status
2- Facing the client and discussion with him his requirements
3- Handing over the all documents of whole projects at end to the client
The difficult thing is that you are electrocuted.