Which of the following describes the difference between the maximum funding and the end of cost baseline?

A. Funding requirements B. Expected cash flow C. Estimate to completion D. Management reserve E. Funding limit reconciliation

user-image
تم إضافة السؤال من قبل Mohamed El Sayed , Project Manager , Saudi Post
تاريخ النشر: 2014/04/13
naser almhde
من قبل naser almhde , Architectural Computer Aided Design Technician (Architectural CAD Technician) , Bpc

Cost Performance Baseline

The cost performance baseline is an authorized time-phased budget used to measure, monitor, and control overall cost performance on the project. It is developed as a summation of the approved budgets by time period