Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What tool do you prefer to use for project scheduling?

user-image
Question added by Ghada Sameer , Project Manager and media executive , CQA
Date Posted: 2014/07/01
Salauddin Mohammad
by Salauddin Mohammad , Sr. Manager, Software Development , Aspen Technology Inc

MS Project... For smaller projects - Excel..

Syed Muhammad Ahtsham ul Haq Shah
by Syed Muhammad Ahtsham ul Haq Shah , Products and Real Estate Photographer , AW Group of Industries

P6 or MS Projects 

Deleted user
by Deleted user

Project Management Software (i.e MS Project & Primavera)

Can also used Microsoft Excel for preparing Bar Chart w/ S - Curve

Dennis Duenas
by Dennis Duenas , Electrical Engineer-Office , Al Bawani Co. LTD.

One of the most common project management software tool types is scheduling tools. Scheduling tools are used to sequence project activities and assign dates and resources to them. The detail and sophistication of a schedule produced by a scheduling tool can vary considerably with the project management methodology used, the features provided and the scheduling methods supported. Scheduling tools may include support for:

1. Multiple dependency relationship types between activities

2.Resource assignment and levelling

3.Critical Path

4. Activity duration estimation and probability-based simulation

5. Activity cost accounting

Subhranil Mandal
by Subhranil Mandal , Project Coordinator , Ceragon Networks India Pvt. Ltd.

Microsoft Excel

Binil Paul
by Binil Paul , Sr. Planning Engineer , KEO International Consultants

Primavera p6 

cos it has so many. Inbuilt techniques that excel or manually difficult to do

Deleted user
by Deleted user

Primavera P6, Microsoft Project

More Questions Like This