Register now or log in to join your professional community.
Cost is a major factor-tight budget
Maintaining proper gradation itself is the best way of hindering liquefaction with cost effectiveness. any other method to be used depends on the nature and type of load acting on the pavement. if cost is a major factor then maintain well graded mixture of loam and laterite for road and give camber and proper drainage to remove the storm water and water from any other source if possible such rise in GWT.
Vote up if you feel my answer is satisfactory
Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.