Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

A tool used by project manager to track the failure rate so that quality level is within limits is? 1 Control charts 2 Six Sigma 3 Quality control

user-image
Question added by Anjum Jamal , QA QC Engineer , Khatib & Alami
Date Posted: 2014/08/08
Salauddin Mohammad
by Salauddin Mohammad , Sr. Manager, Software Development , Aspen Technology Inc

Control Charts.

LABIB KOOLI
by LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)

Definitely Control charts 

Chakra Dhar
by Chakra Dhar , Senior Mechanical Engineer , ARENCO Consultants

In my opinion by Control Charts

Asanbe Akorede
by Asanbe Akorede , POWER TECHNICIAN , Globacom Nigeria Limited

A tool used by project manager to track the failure rate so that quality level is within limits is control charts

Abrar Hussain
by Abrar Hussain , Contract Manager , Sahara Tamiratt

six sigma

 

Syed Tahir Ali
by Syed Tahir Ali , manager , engineering factory

i thnk no..coz basicaly quality is a mind set of production ppls  good design  proper matetial tools and machines... then QC jsut follow up for the instruction to match with product requirements make quality...mostly places use CNC  WHICH ARE NTO GOOD FOR MASS PRODUCTION  thay are jsut for sample  and modle production  which reduce production target  thoug increse in quality.... it can be handle only educted places not  with normal  production places unemployment and uneducated places

syed khan
by syed khan , Project Engineer - Mechanical , Voltas Limited

It is control charts

More Questions Like This