Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

At what stage of construction should termite protection be applied?

user-image
Question added by Ahmed almatari , PMO Coordinator , Saudi Electricity Company
Date Posted: 2014/08/10
Teodor Pop
by Teodor Pop , BIM Manager , ISG jv

It probably depends from project to project but most of the answers already given are accurate.

Vinesh Vijayan
by Vinesh Vijayan , Architectural Draftsman , AYALA INTERNATIONAL

TERMITE PROTECTION IS APPLIED IN THE  FOUNDATION FILLING

 

Mohammad  Tayyab
by Mohammad Tayyab , Architectural AutoCad Head Draftsman , Saudi Oger LTD

Termite protection is applied after excavation the foundation and before starting of foundation  

Deleted user
by Deleted user

before concreting for footing.

dijo kuriakose adukalil
by dijo kuriakose adukalil , JUNIOR ENGINEER , talal adham partners co

before foundation work( after earth work excavation) 

Deleted user
by Deleted user

TERMITE PROTECTION SHOULD APPLY AFTER THE EXCAVATION WORK AND BEFORE THE CASTING OF FOUNDATION

Muhammad Khalil
by Muhammad Khalil , Chief Engineer (Civil) , Water and Sanitation Services Mardan

1), Just when excavation is completed.2) before backfilling the sides of the foundation3) during wood work

Muhammad amjad Khan
by Muhammad amjad Khan , Project Engineer , Al-Noaimi Agriculture & Irrigation Services

In the start of construction 

termite protection is applied when the structure is in its foundation level .

 

Ahmed almatari
by Ahmed almatari , PMO Coordinator , Saudi Electricity Company

But what is the use of applying this protection before the lean concrete or backfilling ?! isn't it enough to apply it, as Shaik Abdul Khaja Moinuddin comment, before construction of grade slab?! This will protect the structure from termite  not to reach the floor ?! what do you think?!

 Shaik Abdul Khaja Moinuddin

Shaik Abdul Khaja Moinuddin Projects Planner at Nabil & partners

Follow

 

Fadi Al-Maarri
by Fadi Al-Maarri , Projects Coordinator , Dar Al-Handasah (Shair & Partners)

Termite protection is used in preparation for the construction of the foundation. It is applied over the soil bed, right before you cast the blinding concrete. The construction sequence of the raft is excavation -> termite control -> blinding concrete -> waterprooding -> screed -> raft. 

More Questions Like This