Register now or log in to join your professional community.
Every machine has a specified schedule for maintenace if respected and replaced in the right time you can run the machine in max efficiency but care that the maximum o/p of the machine can obtained in some special conditions like type of recommended raw materials and the utilization of machine capacity
I support Mr.Yassin in his answer