Does Conditioning Orifice Plate work when straight pipe run is only 4D totally (for upstream & downstream)?

user-image
Question added by yassin abbas , instrument and control engineer , Scot(Iraq petroleum Company For Oil Transport)
Date Posted: 2014/09/13
Riyas Sahab
by Riyas Sahab , INSIDE SALE ENGINEER , WIKA MIDDLE EAST

No, Conditioning orifice requires only shorter straight length compared to standard orifice. It works well even if the straight pipe run is more than4D total ( Upstream + Downstream). Minimum upstream length required for conditioning orifice is2D and minimum downstream length required for conditioning orifice is2D.

 