Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

Which of the following is the best strategy for limiting production delays caused by equipment breakdown and repair ?

<p style="text-align:left;"><span>Schedule production based on capacity planning</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Plan maintenance activity based on an analysis of equipment repair work orders</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Preauthorize equipment maintenance and overtime pay</span><span>.</span><span> -</span></p> <p style="text-align:left;"><span><span>  </span></span><span>Establish a preventive maintenance program for all production equipment</span><span>.</span><span> -</span></p>

user-image
Question added by Deleted user
Date Posted: 2014/10/01
georgei assi
by georgei assi , مدير حسابات , المجموعة السورية

The correct answer Establish a preventive maintenance program for all production equipment. -

Ibtisam Haider Syed
by Ibtisam Haider Syed , General Accountant , DAR AL AQAR REAL ESTATE LLC

A preventive maintenance program will reduce equipment breakdowns and repairs

Asim Azaldeen Abdalrahman Mhammed
by Asim Azaldeen Abdalrahman Mhammed , Property Manager , TAAM PROPERTY

I agree with the last answer establish ....

Ahmed Sobh
by Ahmed Sobh , Senior mechanical maintenance engineer , AlJAZIRA for steel coating

Apply preventive maintenance techniqe and analyze the problem by root cause analysis

Abdallah Abu Zeyad CMA
by Abdallah Abu Zeyad CMA , Finance Account Manager , Toyota - Abdul Latif Jameel Motors - KSA

Establish a preventive maintenance program for all production equipment.

 

I am Always with this method the preventive before the breakdown accur to avoid any problem.

Deleted user
by Deleted user

Establish a preventive maintenance program for all production equipment  - is the answer

because

A preventive maintenance program will reduce equipment breakdowns and repairs

cesario Jr gajetes
by cesario Jr gajetes , Technician , Qatar Cool District Cooling

Establish maintenance program for all production equipment

More Questions Like This