In the world of Quality, when applying the DMAIC Methodology, at which phase we collect data (Y's) ? :Define - Measure - Analyze - Improve - Control

user-image
Question added by Raafat Sallam , Organizational Development and Training Consultant , Training Centers, Marketing Organizations.
Date Posted: 2014/10/18
Gourab Mitra
by Gourab Mitra , Manager IT Project Program and Delivery Management(Full Time Contract/Consulting Role) , IXTEL(ixtel.com)

The Measure phase of six sigma is where we commence to collect the data around our six sigma project. The measure phase starts with identifying the CTQ characteristic which the project intends to improve and subsequently we work and set up a data collection plan. Setup of data collection strategy/plan is done to essentially ensure that all project team members are on common ground about the Y metric of the project.

Data Collection Plan intends to provide clarity around the metrics to be measured, the performance standards for the project Y (as per the goal statement of Project), defining the Upper specification Limit and the Lower Specification Limit for the Y metric and clearly articulating the defect definition for the project Y metric. Also we must articulate how we intend to capture the Y metric data and document the formula to be used, equipment to be used, database or container where the Y metric is to be stored for project use, the information on the data items that we shall need (as per our formula). In certain cases you may even need to document a training plan for data collection team.

جعفر هندي زين السقاف
by جعفر هندي زين السقاف , "Certified trainer by the Yemeni Engineers Syndicate." , Engineers Syndicate

Agree with answer given by Mr.Gourab Mitra.

Ramendra Sunder Sinha PMP
by Ramendra Sunder Sinha PMP , DGM Planning , Gaur Sons Limited

In DMAIC Method of Quality Control, collection of data is done in the "Control" Phase. "Define" is done in Quality Planning stage. "Measure", "Analyse", "Improve" are done in the Execution / Production Phase as part of QC.

فؤاد أحمد حسين
by فؤاد أحمد حسين , مدير , حكومي

  Thank you ,,, While the DMAIC methodology presented may appear linear and explicitly defined, it should be noted that an iterative approach may be necessary – especially for Black Belts and Green Belts that are new to the tools and techniques that make up DMAIC. For instance, you may find that upon analyzing your data (Analyze phase) you did not gather enough data to isolate the root cause of the problem. At this point, you may iterate back to the Measure phase. In addition, prior knowledge of the tools and techniques is necessary in determining which tools are useful in each phase. Remember, the appropriate application of tools becomes more critical for effectiveness than correctness, and you don’t need to use all the tools all the time

hossam azzam
by hossam azzam , Fast food restaurant,s manager. , alexandria-egypt

Thanks for the invitation

Well......good question

Agreed totally with the excellent description given by Mr, : .Gourab Mitra

Mohamed Batran
by Mohamed Batran , General Manager , Al Blagha Group (ABG)

I agree with the elegant answers of Mr. gourab 

Abdul-Hameed Deeb Al-Sawadi
by Abdul-Hameed Deeb Al-Sawadi , IT Manager , Masaneed Commercial Group (MCG)

Thanks for the invitation and for your good question.

 

Also, thanks for Mr. Gourab Mitra who has given us a detailed explanation about the Data Collection Plan in the Measure phase.

 

Regards for all!

 

 

Mohamed Hamdy Kamal Riad
by Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM

I agree with  answer of Mr. Gourab Mitra

Richa Verma
by Richa Verma , Assistant Manager - Vendor Development , Volvo IndiaPrivate Limited

In MEASURE phase.

Ani Kuriakose
by Ani Kuriakose , Managing Partner – SCM , A. A. Associates

In the DMAIC Methodology, data is collected In the Measure phase.

Nice detailed explanation by Gourab Miitra

Nabil Najim
by Nabil Najim , Assistant Branch Manager , Videotron

In the DMAIC Methodology, we collect data In the measure phase.