Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

When drawing in 2D what Axis do you not work with? Choose one of below. A. X B. Y C. Z D. WCS

user-image
Question added by Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.
Date Posted: 2014/10/28
Asim Zahir
by Asim Zahir , Lecturer , Sarhad University, Peshawar

Z-axis

Suhad Hawamdeh
by Suhad Hawamdeh , Interior Architect & Landscape Designer , -

C.Z

aqib raza
by aqib raza , Design engineer , Interarch buildings products pvt. Ltd

Z

Sohaib Ishaq
by Sohaib Ishaq , Civil Engineer , Nokia Siemens Networks

Z

Muhammad Hammad Khan
by Muhammad Hammad Khan , Sr. Site Architect , Aedas Architects

It depends on which2 axis you are using for2D drawing. Generally, it is Z-Axis if you are working on X & Y axis

Abdul Rahaman
by Abdul Rahaman , Site Engineer , Al Jaber Energy

C. Z

Wael Refaat Nagy Ghali
by Wael Refaat Nagy Ghali , Senior Quantity Surveyor , ASGC Construction LLC

Z

APPAR BATCHA MOHAMED
by APPAR BATCHA MOHAMED , Manager , M/s Afcons Infrastructure Limited

z

wagdy Elsherbiny
by wagdy Elsherbiny , Senior INTERIOR DESIGNER , ALSHAYA ENTERPRISES

z

 

Wadie Naggar
by Wadie Naggar , MECHANICAL TECHNICAL CHIEF ENGINEER , ORASCOM CONSTRUCTION

Z

MD AQUIL ABBAS
by MD AQUIL ABBAS , TECHNICAL ADVISOR , ACTION FOR SOCIAL CHANGE

In any2D drawing there is no any concept of the thirs direction i.e Z direction, hence option C is correct

More Questions Like This