Base load requirement (also baseload) is the minimum level of demand on an electrical supply system over 24 hours.
Option D
d 12-24 hours a day.
Where do you need it for? so it must be12-24 hours per day
12 Hrs to24 Hrs./day
I believe answer is choice "C"
Base load is min. load for24 Hours