Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

How to design a grouting holes spacing, diameter, depth and etc top layer of moderately weathered gneiss followed by a calcite layer of 10-15m?

user-image
Question added by Perumal Muniyandy , Rock Mechanics & Tunnel Construction Engineer / Resident Engineer , InfotechIdeas (Pvt.) Ltd.
Date Posted: 2015/01/22
ali موساوي
by ali موساوي , مهندس مكلف بالدراسات , المخبر الوطني للسكن و العمران

The use of bentonite and casing

 

More Questions Like This