Register now or log in to join your professional community.
A. Engineered cost.
B. Indirect cost.
C. Sunk cost.
D. Target cost.
Option (A) >>>>>>>>>>>>>> Engineered cost.
A. Engineered cost.
observable and known
Option A
I guess answer to be option (d).
Option A is correct